Solicitation – CA: MILCON ERCIP Microgrid, U.S. Army – Due 6/29

Excerpt from solicitation:

Project Title: U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid

Project Location: Mountain View, Santa Clara County, California.

This project provides energy resilience for 14+ days for mission critical functions, utilizing renewable and fossil fuel energy sources. Installation of a microgrid system that will have full islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV) solar system with low voltage switchgear for building energy shifting; a 750kWh battery energy storage system (BESS); an 800kW diesel backup generation system, with a 10,000-gallon fuel storage tank. The microgrid system will include a master microgrid controller, and automatic smart switches controlling the generation resources within the Reserve Center. Microgrid will be installed on a closed restricted network (CRN) requiring an Authority to Operate (ATO) IAW DODI 8510.01. System cybersecurity requirements will be designed IAW UFC 4-010-06 Cybersecurity for Facility Related Control Systems. All proposals will be due on June 29, 2026, at 12:00PM PDT. The specific date and time is identified in the solicitation.

Published: 5/29/26

Due: 6/29/26

Open Procurements

Latest News Releases